Back to category
View product specifications
Shock Absorber Excel-G 334367 Kayaba
£ 100.93
Incl. VAT
In stock
Delivery 03-05-2024
Free Shipping
Secure payment
- Free 30 days span> exchanges
- Any part span>, any car
- Fast shipping: 2 days
- Expert span> support
Fit guarantee, show parts suitable for your vehicle.
or .
-
Specifications
Fitting Position Front Axle Left Shock Absorber Type Gas Pressure Paired article numbers 334366 Shock Absorber System Double End Pipe Shock Absorber Design Suspension Strut Warranty 2 years Number in packaging 1 Pieces needed 2 Price Per Unit Shock Absorber Mounting Type Top pin Similar products of other manufacturers
Manufacturer Manufacturer number Price ASHIKA MA-10029 BREMSI SA0913 GSP 32320142 JAPANPARTS MM-10029 JAPANPARTS 9260440 JAPKO MJ10029 KAYABA 334367 (this product) Manufacturer Manufacturer number Price MONROE 71462 Maysan Mando PS9716209 NIPPARTS N5501027G NPS N490N354 OCAP 82288FL OPTIMAL A-3659GL STELLOX 4214-1081-SX -
Applicability
NISSAN MAXIMA / MAXIMA / MAXIMA QX V (A33) | 03.2000-11.2003 2.0 V6 24V - 1995ccm, 140pk, 103kw - VQ20DE MAXIMA / MAXIMA QX V (A33) | 03.2000-11.2003 2.5 V6 24V - 2496ccm, 209pk, 154kw - VQ25DE MAXIMA / MAXIMA QX V (A33) | 03.2000-11.2003 3.0 V6 24V - 2988ccm, 200pk, 147kw - VQ30DE -
Original part numbers
543032Y904 NISSAN 543032Y905 NISSAN 543032Y987 NISSAN 543032Y988 NISSAN 543032Y989 NISSAN 543036Y300 NISSAN 543036Y325 NISSAN 543036Y400 NISSAN 543036Y425 NISSAN -
Manufacturer
For nearly a century, KYB has specialized in hydraulics, with technology widely used in the automotive industry. KYB is the leading hydraulic company from Japan. The KYB group, which has 15,000 employees worldwide,has a turnover of more than 3.8 billion, of which 60% comes from the sale of shock absorbers for cars. From its 15 factories in Asia, Europe and the United States, KYB has an annual production capacityof more than 75 million shock absorbers. KYB also has the largest shock absorber factory in the world, with a capacity of more than 50 million units. It is highly automated and can change from one strut to another in 15 seconds from producing. -
Delivery time
Expected delivery date:
03-05-2024
-
Questions?
Secure payment