Timing Belt Set PowerGrip® K025552XS Gates
£ 45.21
Incl. VATFree Shipping
Secure payment
-
Free 30 days span> exchanges
-
Any part span>, any car
-
Fast shipping: 2 days
-
Expert span> support
Fit guarantee, show parts suitable for your vehicle.
or .
-
Specifications
application Timing belt Distribution Set Without water pump Part number of the recommended special tools STT-1 Warranty 2 years -
Applicability
RENAULT ESPACE Mk ESPACE Mk IV (JK0/1_) | 11.2002-12.2015 1.9 dCi (JK0U) - 1870ccm, 116pk, 85kw - F9Q 820 ESPACE Mk IV (JK0/1_) | 11.2002-12.2015 1.9 dCi (JK0U, JK0G) - 1870ccm, 120pk, 88kw - F9Q 680, F9Q 820, F9Q 826 LAGUNA II LAGUNA II (BG0/1_) | 03.2001-12.2007 1.9 dCi (BG08, BG0G) - 1870ccm, 120pk, 88kw - F9Q 650, F9Q 670, F9Q 674, F9Q 750 LAGUNA II Sport Tourer (KG0/1_) | 03.2001-12.2007 1.9 dCi (KG0G) - 1870ccm, 120pk, 88kw - F9Q 670, F9Q 674, F9Q 750 -
Manufacturer
With more than 100 years of experience, Gates is one of the largest manufacturers of drive belts, distributors and relatable products in passenger cars. Over 35 automotive brands make use of distributor straps, multi-straps, tensioners and tension rollers produced by Gates at the first installation. The same products are then sold under the Gates label to the private market.
In addition to loose belts, spanners and related, Gates also sells complete kits to renew the engine's drive. These kits are especially popular with garages and service points because they guarantee that all crucial parts of the engine are in top condition. An additional advantage is that a complete installation kit is often more advantageous and always contains the right products, specific to your vehicle.
Gates products distinguish themselves in the following areas:
- Top quality OE products
- OE durability
- Complete distribution and Multirim replacement kit
- Also available in full set water pumps available at reduced rate
- Substantially cheaper than an original Belt (set) from the dealerAt the moment we have the following Gates products in our range:
- Distribution & Distribution sets
- Multiriemen & Multiriemsets
- Teamrolls & Walkrolls
- Thermostats -
Delivery time
Expected delivery date:
25-05-2026
Secure payment